165 Mill Rd. structure fire

post-incident analysis created by NGFD Group 4

Date
April 12, 2016
Time
11:54
Address
165 Mill Rd
Rochester, NY 14626

Description

House on fire 165 Mill Rd.  Initial dispatch for a structure fire.  GPD on scene reporting a fire in the house.  2C257 on scene confirming fire in the house with fire showing from the "B" "C" corner of a single story house with everyone out of the structure.

2C-57-IC, 2C-37 on scene 

E276, E273, E274, E277, R278 (BFD 223 &226 RIC) (RRFD 250 & 257 extra unit 270 out of service for PM)

276 stretched 1 3/4" line, 273 secured water supply at Place One Dr. & Mill Rd to 276, 274 Stretched backup line and conducted search, RRFD provided horizontal ventilation, BFD RIC duties, and 277 & 278 provided support services including overhaul and rehab.  Fire confined to room of orgin and minor extension to outside soffits and siding.  Utilities secured and overhaul of fire area to confirm fire extinguishment.  NGFD assisted MCFB with investigation assistance.  1 resident transported by GVA for smoke inhilation and burns.  

Comments

Highlights

360 immediatley determined fire area and IC in place and controlled throughout incident.

Extremely narrow hallway and turns accessing bedroom fire area.  

Enough resources on initial dispatch with RIC and extra unit if needed.  

Crew integrity and accountability was handled very well.   off duty FF and POV responses checked in with command or responded on equipment from firehouse.  

crew prepared for fire allowed for a timely strech and advance of handline without waiting for crews to assemble or finish getting dressed. Crews performed correct tasks in a timely manner

basic firefighting skills handled very well.  advancing lines, water supply, back up line and search all completed

Responding Units

Unit Dispatched On-Scene Actions Performed
277 1154

arrived on scene and assisted with support services overhaul, and final extinguishment

278 1154 1208

set up rehab area, SCBA filling station, and also crew of 3 FF monitored air conditions and also assisted with overhaul

250 257 1154 1202

set up for ladder placement (270 OOS for PM) conducted horizontal ventilation and prepared for vertical ventilation if necessary.

223 226 1154 1202

Set up RIC tools and equipment

276 1154 1159

initial fire attack with 1 3/4" handline through front door to fire area in "B" "C" bedroom. contained fire to room of origin, checked for extension and overhauled fire area

273 1154 1200

secured water at Place one Dr. and Mill Rd. driver assisted with securing water to 276, FF assisted 276 crew with initial fire attack on bedroom. EMT assisted with outside exterior duties after making hydrant

274 1154 1200

stretched 2nd 1 3/4" handline from 276 and provided backup line and primary search of 1st floor living room and kitchen area. also checked basement for extension and utilities