Fifth Alarm Dollar Store Fire

post-incident analysis created by IncidentSmart

Incident Number
2009028089
Date
November 23, 2009
Time
11:58
Address
1731 North Clinton Avenue
Rochester, New York 14617

Description

Fifth alarm arson fire at the Family Dollar store that spread to six other businesses at a strip mall. The Family Dollar store and 5 other businesses were destroyed. In addition to the Fifth Alarm assignment, seven County companies were special requested to the scene. This incident became a defensive operation after 10 minutes. There were three significant wall collapses during this incident. Fire was confined between two firewalls. Incident was placed under control at 1716 hours.

Responding Units

Unit Dispatched On-Scene Actions Performed
E16 1158 1201

First Alarm. Initial interior attack with 1-3/4" handline. Rapidly deteriorating conditions necessitated an evacuation. Spent the rest of fire operating large diameter hoslines and appliances.

Q/M6 1158 1201

First Alarm. M6 laid out to a hydrant and supplied 2 3' supply lines to E16 and vented "A" side plate glass windows. Q6 raised their aerial ladder to the "A" side roof to attempt vertical ventilation. Due to deteriorating conditions Q6 had to exit the roof by T10's aerial ladder at the "C" side roof. Q6 walked back to their apparatus where they operated their ladderpipe, 3" handline, BlitzFire master stream, and cut an inspection roof hole above the "D" side exposure.

E10 1158 1202

First Alarm. Laid out to hydrant and supplied E16 with 2 3-inch supply lines. Officer took command of the fire until relieved by B3. Assisted with backup 2-1/2" hoseline and front window ventilation. Supplied 2 3-inch supply lines to St Paul's platform. Operated mercury nozzle at "A/B" corner.

R11 1158

First Alarm. Assisted with advancement of initial 2-1/2" handline. Later, operated a 2-1/2 " handline on 2nd floor of "B" exposure. Later, operated 2 2-1/2: handlines into "B" side carports and stockroom. Later, assisted with "B" side trench cut on exposure roof.

T10 1159

First Alarm. Positioned their apparatus at the "B/C" corner and assisted the members of Q6 getting off the roof. Used their platform to flow 2 elevated master streams. Also supplied a 3-inch handline for a BlitzFire, a 2-1/2" handline with a smooth bore nozzle, and a 2" TFT handline.

E17 1203

Second Alarm. Provided 2 3-inch supply lines to Q6. Worked off Q6 with a 2-1/2 inch handline to clothing store and 3-inch hoseline to a mercury nozzle to fire side of wall.

E13 1203

Second alarm. Provided 2 3-inch supply lines to T10. Operated a BlitzFire into "B/C" corner and later operated a 1-3/4 inch hoseline into 2nd floor exposure at the auto parts store's storage area.

T4 1203

Second alarm. Operated their prepiped master stream waterway into "D" side fire area using a 1-3/4" nozzle and their monitor gun.

Q/M1 1213

Third alarm. Operated their ladderpipe into "B" side fire area. Supplied 3 1-3/4" handlines, 2 BlitzFires, 1 3-inch handline and 2 3-inch supply lines to RT10. M1 provided 2 3-inch supply lines to Q1 that were 650 feet long.

E5 1213

Third alarm. Provided 2 3-inch supply lines to T10 that were 1400 feet long, and 2 3-inch to Q300 (Brighton Fire Dept) and operated a BlitzFire master stream.

E3 1213

Third alarm. Provided 2 3-inch supply lines to T4. Operated a mercury nozzle with a 1-3/8" tip, and a 3-inch handline off T4.

E1 1230

Fourth alarm. Provided 2 3-inch supply lines to Q150 (St. Paul FD). Operated a mercury nozzle, a BlitzFire, and a 1-3/4" handline during the incident.

E8 1230

Fourth alarm. Provided 2 3-inch supply lines to Q300 (Brighton FD). Operated a 2-1/2" handline off Q300. Later operated a mercury nozzle and a 1-3/4" handline off Q1.

T2 1230

Fourth alarm. Positioned apparatus on "D" side. Did not use apparatus. Pieced in 300-foot of 3-inch supply line to Q300 (Brighton FD). Operated a master stream off Q300 into "C" side and effected forcible entry into rear of plaza. Later assisted with a trench cut on the "B" side.

Q150 1230

Fourth Alarm - special request (St. Paul FD). Performed master stream operations utilizing the platform on the "A" side.

BFD300 1230

Fourth Alarm - special request (Brighton FD). Performed master stream operations utilizing platform on the "C" side.

Q180 1258

Special request (Ridge-Culver FD). Performed master stream operations utilizing the platform on the "B" side.

F112 1308

Special request. (Point Pleasant FD Engine). Provided 2 3-inch supply lines to Q1.

F182 1312

Special request. (Ridge-Culver Engine). Provided 5" large diameter supply line to Q180.

F123 1327

Special request. (W Webster FD Engine). Staging.

F103 1331

Special Request. (Webster FD Engine). Completed 300' supply line for F112 which was supplying Q1.

E7 1354

Fifth Alarm. Relief crew. Operated handlines and master streams on the "A" side.

E12 1354

Fifth alarm. Relief crew. Operated 1-3/4" handline off Q1.

T3 1354

Fifth Alarm. Relief crew. Operated a 2-1/2" handline off Q300.

1422

"A" side parapet wall collapse.

1716

Fire under control.

First Units on Scene

Prior to Fire

Satellite image of the location prior to the fire, image from 9/5/2009

Prior to Fire

After the Fire

Satellite image of the location after the fire, image from 5/9/2011

After the Fire